Hystar Group
Hystar Developments

This company was formed in 1989 to carry out commercial developments and to date has carried out the conversion of a warehouse to warehouse and offices, which were subsequently let and managed.

A commercial development in Redhill for laboratory research work and manufacture, complete with ancillary offices was constructed using steel frame construction for the production units with sheeted cladding at high level and brickwork at low level. Power floated flooring techniques were adopted.

The linking together of an existing church in Reigate with existing church halls that had been constructed during the Edwardian era produced quite a challenge. This required the inclusion of a new lift shaft to serve the buildings together with new accommodation for caretaker and further church offices and halls. In order to ensure this, work was carried out to integrate the two buildings together. The link site contained some low level dwellings made out of stone, This stone was carefully removed and then cut to form a facing to the new work. Existing stone windows were removed and then replaced in new positions. The work was appreciated by Reigate & Banstead Borough Council and received a Design Award.

HYSTAR GROUP  |  CONSTRUCTION  |  INVESTMENTS  |  DEVELOPMENTS  |  INTERNATIONAL  |  COMMUNITY  |  CONTACT

Web site design by Astute Enterprise    |    © Copyright 2017 Hystar Group